The Project
Builder: FDC Constructions
Interior Designer: Futurespace
Manufacture to install: 6 weeks
AWM Products:
- The Monorail system on the Delta ‘U’ leg
- Customised storage desk end that went to the floor in a teak look finish.
- The pedestal storage with a laptop docking station with phone charges, internal cables and monitor cables.
- Paper trays with magnetic name plates were also provided.